Finally the light fixture arrived! Besides one or two other additional things that aren't fixtures we are basically finished with the bathroom renovation.
The final cost was around $3500, less labor of course.
A little bit of touchup work needs to be done but it's minor. We'll probably just leave it as is for a guest bath and not a master bath.
It's not perfect but I'm glad to be done with it. The tile is probably the weakest link. I learned a lot about it by doing it, so the next tile job will be better.
bye bye 1971!
No comments:
Post a Comment